Featured projects
Construction of the water supply and sewerage network in Petra Sinana Šaina Street
Construction of water and sewer network works with accompanying infrastructure and asphalting …
View details![Construction of the water supply and sewerage network in Petra Sinana Šaina Street](https://mibral.ba/wp-content/uploads/2023/12/2023-12-P-Sinana-Saina-750x936-1.webp)
Construction of a network for drainage of faecal wastewater of the facility
Execution of fecal sewage network works with accompanying infrastructure and asphalting.
View details![Construction of a network for drainage of faecal wastewater of the facility](https://mibral.ba/wp-content/uploads/2023/12/2023-12-Kanalizacija-Trebevic-750x936-1.webp)
Works on increasing drinking water capacity in the water supply system of the Jažić spring
Execution of construction works, mechanical and electrical installations, water intake and pumping plant.
View details![Works on increasing drinking water capacity in the water supply system of the Jažić spring](https://mibral.ba/wp-content/uploads/2023/12/2023-12-Vodozahvat-Jazici-750x936-1.webp)
Construction works on the ongoing maintenance/rehabilitation of the promenade
Construction of the promenade in Maršala Tita Street
View details![Construction works on the ongoing maintenance/rehabilitation of the promenade](https://mibral.ba/wp-content/uploads/2023/12/2023-12-Setnica-M-Tita-750x936-1.webp)
Reconstruction works of the City Park Jezero – Betanija
Constraction works on the arrangement of the City Park Jezero – Betania, including 5 children’s playgrounds, 7 recreational zones …
View details![Reconstruction works of the City Park Jezero – Betanija](https://mibral.ba/wp-content/uploads/2023/12/2023-12-Betanija-750x936-1.webp)
Reconstruction and extension of the Local Community Vraca building with establishing a medical centre
Reconstruction and extension of Local Community Vraca building with the establishing a medical centre, including all finishing works …
View details![Reconstruction and extension of the Local Community Vraca building with establishing a medical centre](https://mibral.ba/wp-content/uploads/2023/12/2023-12-MZ-Vraca-750x936-1.webp)
Construction works on the reconstruction and construction of children’s playgrounds
Construction and reconstruction of 10 children’s playgrounds with the installation of playground equipment and park furniture in the area …
View details![Construction works on the reconstruction and construction of children’s playgrounds](https://mibral.ba/wp-content/uploads/2023/12/2023-12-Djecija-igralista-750x936-1.webp)
Procurement of concrete accessories for paving
Paving of the memorial park Kosturnica with the installation of accompanying park furniture …
View details![Procurement of concrete accessories for paving](https://mibral.ba/wp-content/uploads/2023/12/2023-12-Park-Kosturnica-750x936-1.webp)
Execution of works on the construction of fecal and storm sewers
Relocation of the sewage system for the construction of a new building.
View details![Execution of works on the construction of fecal and storm sewers](https://mibral.ba/wp-content/uploads/2023/10/Kanalizacije-Istocna-Ilidza-750x936-1.jpg)
Construction works Teikom BH
Carrying out works on the expansion of the parking lot, the construction of a ramp and an oil separator within the business building Teikom BH.
View details![Construction works Teikom BH](https://mibral.ba/wp-content/uploads/2023/10/Vanjsko-uredenje-Teikom-750x936-1.jpg)
Reconstruction of water supply network-V phase
Reconstruction of the water supply network with a total length of over 36 km in over 45 locations in the area of the municipalities of the Canton Sarajevo.
View details![Reconstruction of water supply network-V phase](https://mibral.ba/wp-content/uploads/2023/10/EBRD-Vodovod-750x936-1.jpg)
Construction works of the promenade in Dobrinja along the river Dobrinja
Complete exterior landscaping along the promenade, including paving, lighting and furniture installation.
View details![Construction works of the promenade in Dobrinja along the river Dobrinja](https://mibral.ba/wp-content/uploads/2023/10/Setnica-Dobrinja-750x936-1.jpg)
Arrangement and furnishing of the public area Sabita Hadžić Square and Školski Square
Arrangement and furnishing of the public area, Sabita Hadžić square and School square with mutual connection in ul. Mala Aleja – Ilidža center …
View details![Arrangement and furnishing of the public area Sabita Hadžić Square and Školski Square](https://mibral.ba/wp-content/uploads/2023/10/Trgovi-Ilidza-750x936-1.jpg)
Reconstruction of the water supply and sewerage network in Kranjčevićeva street II
The reconstruction of the water supply and sewerage network in Kranjčevićeva Street includes the construction of a pressure pipeline …
View details![Reconstruction of the water supply and sewerage network in Kranjčevićeva street II](https://mibral.ba/wp-content/uploads/2023/10/ViK-Kranjceviceva-750x936-1.jpg)
Wastewater collection and treatment Zenica
The project represents the construction of the main city collector for fecal sewage and a collector for rain sewage on the left bank of the Bosna River …
View details![Wastewater collection and treatment Zenica](https://mibral.ba/wp-content/uploads/2023/10/Kolektor-Zenica-750x936-1.jpg)
Construction of a separate sewerage network in parts – Moscanica Municipality
Construction of a separate sewage network with house connections and all accompanying infrastructure…
View details![Construction of a separate sewerage network in parts – Moscanica Municipality](https://mibral.ba/wp-content/uploads/2023/10/Kanalizacija-Hladivode-750x936-1.jpg)
Construction of a recreation area in Varazdinska street
Construction of urban area for rest and recreation with content for children and adults. This project included a sports and a children’s playground with equipment …
View details![Construction of a recreation area in Varazdinska street](https://mibral.ba/wp-content/uploads/2023/10/Igraliste-Varazdinska-750x936-1.jpg)
Construction works on the SRC facility Zlatno polje near the primary school Sokolje
Execution of works on the construction of the SRC facility “Zlatno polje” near the primary school Sokolje including sports fields …
View details![Construction works on the SRC facility Zlatno polje near the primary school Sokolje](https://mibral.ba/wp-content/uploads/2023/10/2231-SCR-Sokolje-750x936-1.jpg)
Regulation of the right bank of the Bosna River in Vogosca
Regulation of the right bank of the river Bosna in the street “Nova železnička stanica” upstream from the bridge.
View details![Regulation of the right bank of the Bosna River in Vogosca](https://mibral.ba/wp-content/uploads/2023/10/Regulacija-Bosne-u-Vogosci_750x936.jpg)
Construction works on the rehabilitation of the Bistrički stream in Sarajevo
Performed works on rehabilitation of the dammed stream and reconstruction of the sewage network. Difficult working conditions …
View details![Construction works on the rehabilitation of the Bistrički stream in Sarajevo](https://mibral.ba/wp-content/uploads/2023/10/Bistricki-potok-750x936-1.jpg)
Construction works on the construction of a residential building
Construction of a semi-circular residential building with very demanding construction technology.
View details![Construction works on the construction of a residential building](https://mibral.ba/wp-content/uploads/2023/10/Okrugli-objekat-Ilijas-750x936-1.jpg)
Construction of 5 residential buildings – Sarajevo resort Osenik
Turnkey construction of 5 residential buildings including construction, electrical, mechanical and plumbing and sewage installations …
View details![Construction of 5 residential buildings – Sarajevo resort Osenik](https://mibral.ba/wp-content/uploads/2023/10/Osenik-5kuca-750x936-1.jpg)
Construction works of reservouar for alternative water supply for civil protection
Execution of works on the construction of reservoirs for alternative supply of water for civil protection with all accompanying infrastructure …
View details![Construction works of reservouar for alternative water supply for civil protection](https://mibral.ba/wp-content/uploads/2023/10/Rezervoar_CZ_750x936.jpg)
Separate sewage network in V. Curcic and Kodzin streets
Works on construction of a separate sewage network, concreting of monolithic inspection manholes, installation of channel grids for surface water drainage …
View details![Separate sewage network in V. Curcic and Kodzin streets](https://mibral.ba/wp-content/uploads/2023/06/Separatna-kanalizaciona-mreza-u-ulicama-V.Curcica-i-Kodzina-750x936-1.jpg)
Works on construction of external sewerage system and retaining wall
Relocation of the existing fecal sewerage profile DN400mm and construction of a retaining wall 240m long, with an average height of 3.00m …
View details![Works on construction of external sewerage system and retaining wall](https://mibral.ba/wp-content/uploads/2023/06/Radovi-na-izradi-vanjske-kanalizacije-i-potpornog-zida-750x936-1.jpg)
Works on protection of the pedestrian zones in Alipasino polje
Asphalt cutting, dismantling of concrete slabs, demolition of existing concrete curbs, mechanical excavation and preparation of a new base for the installation of posts.
View details![Works on protection of the pedestrian zones in Alipasino polje](https://mibral.ba/wp-content/uploads/2023/06/Zastita-pjesackih-zona-Alipasino-polje-750x936-1.jpg)
Carrying out works on the regulation of the Sušica stream – Bare
Works on the relocation of the existing fecal sewerage network DN 400mm with the construction of concrete manholes.
View details![Carrying out works on the regulation of the Sušica stream – Bare](https://mibral.ba/wp-content/uploads/2023/06/Regulacija-potoka-Susica-Bare_750x936.jpg)
Infrastructure Sarajevo Resort, Osenik bb, Hadžići
The subject of the contract is works on: construction of a stormwater and fecal sewage network with a length of 1,820.34 m’. Construction of a water supply network …
View details![Infrastructure Sarajevo Resort, Osenik bb, Hadžići](https://mibral.ba/wp-content/uploads/2023/06/Izgradnja-Infrastrukture-Osenik-bb-Hadzici_750x936.jpg)
Execution of works on the building of the Hrasnica hall
Works on the reconstruction, adaptation and construction of the business hall, including the installation of electrical installations, water and sewage networks …
View details![Execution of works on the building of the Hrasnica hall](https://mibral.ba/wp-content/uploads/2023/06/Radovi-objektu-hala-Hrasnica-750-936.jpg)
Construction of a children’s playground for the Association of Citizens of Oaza and Žubor
Construction of a children’s playground. Preparatory and earthworks, concreting of the base and foundation for children’s furniture.
View details![Construction of a children’s playground for the Association of Citizens of Oaza and Žubor](https://mibral.ba/wp-content/uploads/2023/06/Izgradnja-djecijeg-igralista-Udruzenja-Gradjana-Oaza-i-Zubor-750x936-1.jpg)
Zajezina Ilijaš filter plant
Development of the main project and execution of works on the facility of the filter plant with all accompanying hydro-mechanical and electrical works.
View details![Zajezina Ilijaš filter plant](https://mibral.ba/wp-content/uploads/2023/06/Filtersko-postrojenje-Zajezine-Ilijas-750x936-1.webp)
Construction of water supply line, pumping stations, rehabilitation of water supply and laboratory facilities in Zenica
Construction of the water supply line Crkvice-Crkvičko brdo-Lamela, pumping stations Hamida and Crkvice and four rainwater overflow lines …
View details![Construction of water supply line, pumping stations, rehabilitation of water supply and laboratory facilities in Zenica](https://mibral.ba/wp-content/uploads/2022/09/Zenica-radovi-750x936-1.webp)
Installation of fixed and mobile posts on the Dobrinja promenade
Dismantling of existing concrete slabs and concrete curbs with removal to the landfill ….
View details![Installation of fixed and mobile posts on the Dobrinja promenade](https://mibral.ba/wp-content/uploads/2022/09/Stubici-DObrinja-750x936-1.webp)
Earth subsidence at Mokrine
Clearing the location with the construction of the access road, installation of a warning board. Mechanical and manual excavation, construction of the drainage system …
View details![Earth subsidence at Mokrine](https://mibral.ba/wp-content/uploads/2022/09/Mokrine-Cover-750x936-1.webp)
Rehabilitation of the slope
The work on the stabilization of the slope in Hakije Kulenovića Street was carried out in two phases. In phase I, the slope above Hakije Kulenovića Street was resolved …
View details![Rehabilitation of the slope](https://mibral.ba/wp-content/uploads/2022/09/Hakije-Kulenovica-Cover-750x936-1.webp)
Earth subsidence with works on separate sewerage and water supply network
Rehabilitation of landslides with execution of works on the separate sewerage and water supply network. Construction of a sewage network …
View details![Earth subsidence with works on separate sewerage and water supply network](https://mibral.ba/wp-content/uploads/2022/09/Hamida-Besirevica-Cover-750x936-1.webp)
Restruction of the pressure pipeline on Jahorina
Reconstruction of the pressure pipeline form the pumping station “Vrelo Prače” to the reservoir “Mladost” on Jahorina Mountain.
View details![Restruction of the pressure pipeline on Jahorina](https://mibral.ba/wp-content/uploads/2022/09/Potisni-cjevovod-Jahorina-Cover-750x936-1.webp)
Reconstruction of water and sewerage network with asphalting Alifakovac
Reconstruction of the sewerage and water supply network with asphalting in part of Veliki Alifakovac street and Alifakovac, Maguda and Megara streets …
View details![Reconstruction of water and sewerage network with asphalting Alifakovac](https://mibral.ba/wp-content/uploads/2022/09/Alifakovac-Cover-750x936-1.webp)
Drainage rehabilitation works
The subject of the contract is drainage works at three locations. In Bilješevo, an underground pipeline for drainage of the area above the highway was built in Bilješevo …
View details![Drainage rehabilitation works](https://mibral.ba/wp-content/uploads/2022/09/JP-Autoceste-Cover-750x936-1.webp)
Reconstruction of the water supply system in Izeta Delica Street
Reconstruction of the water supply system with dactyl pipes DN 100 in length of 1,140.00 m, execution of 55 pieces of house connections …
View details![Reconstruction of the water supply system in Izeta Delica Street](https://mibral.ba/wp-content/uploads/2022/09/Izeta-Delica-Cover-750x936-1.webp)
Construction of Toplik facilities
Construction work on the reconstruction of the basement in the existing building and the construction of three apartments within the business building …
View details![Construction of Toplik facilities](https://mibral.ba/wp-content/uploads/2022/09/Toplik-Cover-750x936-1.webp)
Construction of business hall
Construction of a industrial hall from the construction of the building to all installations and interior painting, ceramic and other finishing works as requested by the investor.
View details![Construction of business hall](https://mibral.ba/wp-content/uploads/2022/09/Hala-Blazuj-Cover-750x936-1.webp)
Residential and commercial building Vučica, Bjelašnica
Execution of preparatory, concrete and AB works, masonry, insulation, sheet metal works, as well as works on flat roofs, exterior decoration …
View details![Residential and commercial building Vučica, Bjelašnica](https://mibral.ba/wp-content/uploads/2022/09/Vucica-Cover-750x936-1.webp)
Exterior decoration Vukov Vis
The project included the procurement, transport of materials and execution of exterior works of the residential and commercial building Vukov Vis in the locality of Bjelašnica.
View details![Exterior decoration Vukov Vis](https://mibral.ba/wp-content/uploads/2022/09/Vukov-Vis-Cover-750x936-1.webp)
Reconstruction works of the tartan track
Staking out the athletics track and demolishing the existing concrete curbs. Preparation and concreting of the soil base for the expansion of the athletics track …
View details![Reconstruction works of the tartan track](https://mibral.ba/wp-content/uploads/2022/09/Tartan-staza-750x936-1.webp)
Landscaping of the Mojmilo Forest Park, Municipality Novi Grad
Excavation of the ground for the construction of a footpath and drainage works. Planning and preparation of the base for placing concrete blocks…
View details![Landscaping of the Mojmilo Forest Park, Municipality Novi Grad](https://mibral.ba/wp-content/uploads/2022/09/Uredjenje-staze-Mojmilo-Cover-970x936-1.webp)
Construction of children playground
Preparatory and earthworks, installation of concrete fittings and rubber surfaces. Installation of panel fence, curbs, and children’s equipment …
View details![Construction of children playground](https://mibral.ba/wp-content/uploads/2022/09/Igraliste-Opcina-Hadzici-cover-970x936-1.webp)
Reconstruction of water distribution pipelines Sarajevo (LOT3)
Reconstruction of distributive water pipelines DN 100, DN 150, DN 200, DN 400 and DN 500 on five stocks, Solidarity Square, Bulevar Mimara Sinana …
View details![Reconstruction of water distribution pipelines Sarajevo (LOT3)](https://mibral.ba/wp-content/uploads/2021/11/Rekonstrukcija_potisnog_cjevovoda_LOT3_750x936.jpg)
Reconstruction of pressure water pipelines Sarajevo (LOT2)
Reconstruction of pressure water pipelines DN 700, DN 500and DN 400 on three stocks, Faculty of Veterinary Medicine – Šentada, Zmaja od Bosne and Bulevar Meše Selimovića …
View details![Reconstruction of pressure water pipelines Sarajevo (LOT2)](https://mibral.ba/wp-content/uploads/2021/11/Rekonstrukcija_potisnog_cjevovoda_LOT2_01_750x936.jpg)
Landscaping of the right riverbed of Drina
Cutting of vegetation and removal of alluvium, cleaning of troughs, lining of slopes of troughs with stone prism, AB works.
View details![Landscaping of the right riverbed of Drina](https://mibral.ba/wp-content/uploads/2021/11/Uredjenje-obale-Drine-Gorazde-05-750x936-1.jpg)
Emergency repair of damaged slab on the piped part of Bistricki stream
Rehabilitation and renovation of squares with asphalting and installation of new slabs as well as construction and separation …
View details![Emergency repair of damaged slab on the piped part of Bistricki stream](https://mibral.ba/wp-content/uploads/2021/11/Bistricki-potok-02-750x936-1.jpg)
Arrangament of Sabora Bosanskog Square and King Aleksandar Square
Rehabilitation and renovation of squares with asphalting and installation of new slabs as well as construction and separation of the pedesrtian zone
View details![Arrangament of Sabora Bosanskog Square and King Aleksandar Square](https://mibral.ba/wp-content/uploads/2021/11/Dobrinja_trgovi_10_750x936.jpg)
Reconstruction of water distribution pipelines Sarajevo
Cutting and removing asphalt, curbs removal, humus removal, excavation of the ground with planning for the construction of the playground. Construction of a playground …
View details![Reconstruction of water distribution pipelines Sarajevo](https://mibral.ba/wp-content/uploads/2021/11/DSC_1587_750_936-1.jpg)
Construction of kids playgound in Envera Sehovica Street
Cutting and removing asphalt, curbs removal, humus removal, excavation of the ground with planning for the construction of the playground. Construction of a playground …
View details![Construction of kids playgound in Envera Sehovica Street](https://mibral.ba/wp-content/uploads/2020/12/Uredjenje-igralista-u-ul-Envera-Sehovica-750x936-1.jpg)
Construction of a sports field at Mojmilo Forest Park
Construction of a sports field with machine and manual excavation and removal of excavated material to the landfill. Reinforcement and concreting of foundation strips and walls …
View details![Construction of a sports field at Mojmilo Forest Park](https://mibral.ba/wp-content/uploads/2020/12/Izgradnja-sportskog-igralista-Park-sume-Mojmilo-780x936-1.jpg)
Athletic track at the stadium “Vlajko Petrović” Pale
Construction of an athletics track, with excavation of the ground and filling of tampons with rolling. Procurement and installation of two layers of asphalt and installation of canals …
View details![Athletic track at the stadium “Vlajko Petrović” Pale](https://mibral.ba/wp-content/uploads/2020/12/Atletska-stazia-stadion-Vlajko-Petrovic-Pale-750x936-1.jpg)
Athletic track at the stadium “Hakija Mršo” Vogosca
Demolition of the existing substrate. Planning substrate and filling of tampons with compaction. Procurement and installation of concrete curbs …
View details![Athletic track at the stadium “Hakija Mršo” Vogosca](https://mibral.ba/wp-content/uploads/2020/12/Atletska-staza-Vogosca-08-750x936px-c.jpg)
Reconstruction and construction of the corporate building Bosna S d.o.o. Sarajevo
Demolition and removal of the existing building, excavation for a new building, construction of reinforced concrete piles ø 600 mm …
View details![Reconstruction and construction of the corporate building Bosna S d.o.o. Sarajevo](https://mibral.ba/wp-content/uploads/2020/06/Upravna-zgrada-BosnaS-750x936px.jpg)
Residential and commercial building in Dolac Malta
Preparatory and earthworks, construction of PO + P +6 floors, construction of all internal installations including water supply and sewerage networks …
View details![Residential and commercial building in Dolac Malta](https://mibral.ba/wp-content/uploads/2020/06/Stambeno-poslovni-objekat-Dolac-Malta-750x936px.jpg)
Landscaping of the Bosna riverbed in the settlement Svrake
Removal of alluvium, cutting of vegetation, cleaning of troughs, lining of slopes of troughs with stone, AB works, laying of corrugated sewer …
View details![Landscaping of the Bosna riverbed in the settlement Svrake](https://mibral.ba/wp-content/uploads/2020/06/Korito-Bosne-Svrake-750x936px.jpg)
Execution of works on landslide remediation and permanent regulation of the river Ljubina
Staking out the route, cutting of shrubs and low vegetation, machine excavation of the ground, machine cleaning of the riverbed, construction of reinforced …
View details![Execution of works on landslide remediation and permanent regulation of the river Ljubina](https://mibral.ba/wp-content/uploads/2020/06/Sanacija-klizista-Ljubine-750x936px.jpg)
Regulation of the river Prača in settlement Hrenovica
Regulation of the river Prača in the settlement of Hrenovica, 3.4 km long, with lining of the riverbed and banks with stone, relocation of the riverbed …
View details![Regulation of the river Prača in settlement Hrenovica](https://mibral.ba/wp-content/uploads/2020/06/Regulacija-Prace-750x936px.jpg)
Construction of a children’s playground in street Behdžet Mutevelić
The works include the construction of an amphitheatre with concrete stands, fences and fountains, wide excavation of the ground with arrangement …
View details![Construction of a children’s playground in street Behdžet Mutevelić](https://mibral.ba/wp-content/uploads/2020/06/Igraliste-Behdzeta-Mutevelica-01-750x936px.jpg)
Construction of a sports field in Pofalići Street, Municipality Novo Sarajevo
Construction of a sports field with grandstands, asphalt surface, paving, marking the terrain, installation of gutters and curbs and installation …
View details![Construction of a sports field in Pofalići Street, Municipality Novo Sarajevo](https://mibral.ba/wp-content/uploads/2020/06/Sportsko-igraliste-Pofalici-750x936px.jpg)
Execution of works on landslide remediation at the Jezero – Kromolj site
Construction of supporting structures and drainage behind retaining walls, construction of water supply and sewerage network …
View details![Execution of works on landslide remediation at the Jezero – Kromolj site](https://mibral.ba/wp-content/uploads/2020/07/Izvodjenje-radova-Jezero-Kromolj-750x936px.jpg)
Construction of children’s playground in Envera Šehovića Steet
Preparatory works, terrain planning for the construction of the playground, tartan tiles and installation of curbs, concreting of the foundation …
View details![Construction of children’s playground in Envera Šehovića Steet](https://mibral.ba/wp-content/uploads/2020/06/Igraliste-Envera-Sehovica-750x936px.jpg)
Rehabilitation of the pedestrian area in Ferhadija Street from the Cathedral
Site preparation, geodetic works, removal of existing old stone slabs, construction of drainage systems and reinforced concrete substrates …
View details![Rehabilitation of the pedestrian area in Ferhadija Street from the Cathedral](https://mibral.ba/wp-content/uploads/2020/06/Sanacija-pjesacke-povrsine-Ferhadija-750x936px.jpg)
Execution of landslide remediation works on the site of the settlement of Bušća
Construction of fecal sewage with a diameter of ø300mm-ø800mm, storm sewer with a diameter of ø300mm, installation of manholes and covers …
View details![Execution of landslide remediation works on the site of the settlement of Bušća](https://mibral.ba/wp-content/uploads/2020/06/Sanaciji-klizista-Busca-750x936px.jpg)
Earth subsidence K9, Municipality Novo Sarajevo, Phase I i II
As part of the K-9 landslide rehabilitation we executed mechanical and manual excavations, embankments, drainages and AB walls.
View details![Earth subsidence K9, Municipality Novo Sarajevo, Phase I i II](https://mibral.ba/wp-content/uploads/2020/06/Sanacija-klizista-K9-750x936px.jpg)
Earth subsidence Podgaj – Tekija, Municipality Centar Sarajevo
Earthworks, construction of reinforced concrete walls, construction of piles ø300mm, water supply and sewerage networks with connections.
View details![Earth subsidence Podgaj – Tekija, Municipality Centar Sarajevo](https://mibral.ba/wp-content/uploads/2020/06/Sanacija-klizista-Podgaj-Tekija-750x936px.jpg)
Earth subsidence Dreskovača
Construction of supporting structures and drainage, fecal and rain sewage, water supply system, preparation and execution of final works on the road.
View details![Earth subsidence Dreskovača](https://mibral.ba/wp-content/uploads/2020/06/Sanacija-klizista-Dreskovaca-750x936px.jpg)
Execution of works on landslide remediation at the Jezero – Kromolj site
Construction of supporting structures and drainage behind retaining walls, construction of water supply and sewerage network with house connections …
View details![Execution of works on landslide remediation at the Jezero – Kromolj site](https://mibral.ba/wp-content/uploads/2020/06/Sanacija-klizista-Kliziste-Gak-750x936px.jpg)
Execution of works on the construction of fecal sewage in the area of East Ilidža
Construction of a main collector in the settlement of Vojkovići, secondary collectors in the settlement of Blaca and XI with all the accompanying infrastructure.
View details![Execution of works on the construction of fecal sewage in the area of East Ilidža](https://mibral.ba/wp-content/uploads/2020/06/Fekalna-kanalizacija-Istocna-Ilidza-750x936px.jpg)
Construction of a rain collector at Sarajevo International Airport
Construction of rain collector with centrifugal polyester pipes profile ø250mm-ø1200mm, with construction of manholes …
View details![Construction of a rain collector at Sarajevo International Airport](https://mibral.ba/wp-content/uploads/2020/06/Kisni-kolektor-kolektora-Aerodromu-Sarajevo-750x936px.jpg)
Irrigation system Goražde / Foča-Ustikolina LOT 1 Cvilinsko polje
Construction of irrigation system with pressure pipeline DN200, distribution pipeline DN225, installation of hydrants …
View details![Irrigation system Goražde / Foča-Ustikolina LOT 1 Cvilinsko polje](https://mibral.ba/wp-content/uploads/2020/06/Sistem-navodnjavanja-Cvilinsko-polje-750x936px.jpg)
Execution of works on reconstruction of water supply and sewerage network
Construction of water supply with ductile pipes profile DN 100 i DN 150 and sewerage network with ductile pipes profile DN 600, DN 500 i DN 300.
View details![Execution of works on reconstruction of water supply and sewerage network](https://mibral.ba/wp-content/uploads/2020/04/Nova-distributivna-mreza-Dolina-750x936px.jpg)
Construction of pressure pipeline DN 500
Construction of pressure pipeline with dactyl pipes of profile DN 500 with installation of flexible couplings, oval closures …
View details![Construction of pressure pipeline DN 500](https://mibral.ba/wp-content/uploads/2020/06/Izgradja-potisnog-cjevovoda-Bosna-750x936px.jpg)
Construction of local water supply system from spring Klanice – Nahorevo
Construction of local water supply system from spring Klanice – Nahorevo with construction of water reservoir, chlorine station …
View details![Construction of local water supply system from spring Klanice – Nahorevo](https://mibral.ba/wp-content/uploads/2020/06/Izgradnja-vodovodnog-sistema-Nahorevo-750x936px.jpg)
Reconstruction of water supply network in Obala Kulina Bana
Reconstruction of existing pipeline with ductil pipes Ø400, Ø300 i Ø200, joints, house connections, finishing and asphalt works.
View details![Reconstruction of water supply network in Obala Kulina Bana](https://mibral.ba/wp-content/uploads/2020/06/Obala-Kulina-Bana-750x936px.jpg)
Water supply system Visoko, subsystem Gračanica
Construction of water supply system including various profile pipelines, reservoirs, pumping stations, finishing and asphalting works.
View details![Water supply system Visoko, subsystem Gračanica](https://mibral.ba/wp-content/uploads/2020/06/Vodovodni-sistem-Visoko-Gracanica-750x936px.jpg)