ROADS AND WALKWAYS

Works on protection of the pedestrian zones in Alipasino polje

Project description

Asphalt cutting, dismantling of concrete slabs, demolition of existing concrete curbs, mechanical excavation and preparation of a new base for the installation of posts. Installation of new curbs and road construction. Procurement and installation of automatic lifting column equipment. Installation and drawing of horizontal and vertical signage.