Project description
The work on the stabilization of the slope in Hakije Kulenovića Street was carried out in two phases. In phase I, the slope above Hakije Kulenovića Street was resolved. These works included the reconstruction of the concrete drainage channel between the retaining wall and the street and the creation of a system of stone drainage ribs and covering the slope with stone in a concrete base. Phase II included the protection of the residential part along the slope and the stabilization of the slope below the street, as well as the drainage of this part of the slope. A protective wall and a drainage system for draining the slope under the street were built next to the building.