ROADS AND WALKWAYS

Reconstruction works of the tartan track

Project description

Staking out the athletics track and demolishing the existing concrete curbs. Preparation and concreting of the soil base for the expansion of the athletics track. with the installation of concrete curbs. Improvement of the existing elastic lining with the IAAF certified Conipur Retop system, all in accordance with DIN EN 14877:2013-12.

Geodetic recording of all tracks, starts, finish, relay changes, hurdles and obstacles, and prescribed lines and markings on the fighting grounds. Drawing all lines and markings in prescribed colors, sizes and widths according to the instructions of the International Athletics Federation (IAAF). The lines are made with polyurethane paints for synthetic lining and measurement-certification for the track IAAF certificate.