Carrying out works on the regulation of the Sušica stream – Bare

Works on the relocation of the existing fecal sewerage network DN 400mm with the construction of concrete manholes.

View details
Carrying out works on the regulation of the Sušica stream – Bare

Infrastructure Sarajevo Resort, Osenik bb, Hadžići

The subject of the contract is works on: construction of a stormwater and fecal sewage network with a length of 1,820.34 m’. Construction of a water supply network …

View details
Infrastructure Sarajevo Resort, Osenik bb, Hadžići

Zajezina Ilijaš filter plant

Development of the main project and execution of works on the facility of the filter plant with all accompanying hydro-mechanical and electrical works.

View details
Zajezina Ilijaš filter plant

Construction of water supply line, pumping stations, rehabilitation of water supply and laboratory facilities in Zenica

Construction of the water supply line Crkvice-Crkvičko brdo-Lamela, pumping stations Hamida and Crkvice and four rainwater overflow lines …

View details
Construction of water supply line, pumping stations, rehabilitation of water supply and laboratory facilities in Zenica

Restruction of the pressure pipeline on Jahorina

Reconstruction of the pressure pipeline form the pumping station “Vrelo Prače” to the reservoir “Mladost” on Jahorina Mountain.

View details
Restruction of the pressure pipeline on Jahorina

Reconstruction of water and sewerage network with asphalting Alifakovac

Reconstruction of the sewerage and water supply network with asphalting in part of Veliki Alifakovac street and Alifakovac, Maguda and Megara streets …

View details
Reconstruction of water and sewerage network with asphalting Alifakovac

Drainage rehabilitation works

The subject of the contract is drainage works at three locations. In Bilješevo, an underground pipeline for drainage of the area above the highway was built in Bilješevo …

View details
Drainage rehabilitation works

Reconstruction of the water supply system in Izeta Delica Street

Reconstruction of the water supply system with dactyl pipes DN 100 in length of 1,140.00 m, execution of 55 pieces of house connections …

View details
Reconstruction of the water supply system in Izeta Delica Street

Reconstruction of water distribution pipelines Sarajevo (LOT3)

Reconstruction of distributive water pipelines DN 100, DN 150, DN 200, DN 400 and DN 500 on five stocks, Solidarity Square, Bulevar Mimara Sinana …

View details
Reconstruction of water distribution pipelines Sarajevo (LOT3)

Reconstruction of pressure water pipelines Sarajevo (LOT2)

Reconstruction of pressure water pipelines DN 700, DN 500and DN 400 on three stocks, Faculty of Veterinary Medicine – Šentada, Zmaja od Bosne and Bulevar Meše Selimovića …

View details
Reconstruction of pressure water pipelines Sarajevo (LOT2)