Project description
Reconstruction of the sewerage and water supply network with asphalting in part of Veliki Alifakovac street and Alifakovac, Maguda and Megara streets. The sewage network is made of centrifugal polyester pipes with a total length of 900 m (DN 500, 400 and 300 mm) with home connections, inspection shafts. drainage grates.
The water supply network is made of dactyl pipes of profile 300 and 9 100 mm with the creation of 65 household connections. The final part is asphalting the entire street, with the installation of concrete curbs and road drainage.