Kratak opis
Reconstruction of the water supply system with dactyl pipes DN 100 in length of 1,140.00 m, execution of 55 pieces of house connections, connection of the existing pipeline, construction of a temporary line and connections, and flushing and testing of the pipeline with rehabilitation of part of the trench and final asphalting.