Project description
Staking out the route, cutting of shrubs and low vegetation, machine excavation of the ground, machine cleaning of the riverbed, construction of reinforced concrete walls, stairs for descending into the bed, bridge supports and stabilization thresholds, installation of crushed stone, backfilling with filter layer and excavation material behind concrete walls.