BUILDING CONSTRUCTION

Execution of works on the building of the Hrasnica hall

Project description

Works on the reconstruction, adaptation and construction of the business hall, including the installation of electrical installations, water and sewage networks, installation of aluminum locksmithing in the premises and stainless steel railings on the staircase, production of cement screed substrates, installation of ceramics, production of suspended ceilings on the steel substructure of the epoxy floor in the laboratory room.