WATER SUPPLY AND SEWERAGE

Carrying out works on the construction of Infrastructure at the location marked as "75 dunums" within the Sarajevo Resort at the address Osenik bb, Hadžići

Project description

The subject of the contract is works on: construction of a stormwater and fecal sewage network with a length of 1,820.34 m’. Construction of a water supply network with a length of 1,160.00 m’, production of 56 pieces of concrete shaft for water meters. Preparation of a study with a geodetic survey of the derived state, examination of the newly constructed channel by recording with a camera.