ROADS AND WALKWAYS

Construction works on the closure and installation of fixed and mobile posts on the Dobrinja promenade

Project description

Dismantling of existing concrete slabs and concrete curbs with removal to the landfill. Machine excavation, production of supporting base with installation of concrete curbs for steps. Procurement and installation of fixed and mobile submersible bollards with automatic lifting with electrical installations and production of traffic signals.